Due to the vacuum booster, the mount point for my triple reservoir was impacted due to the touch points with the booster. So I moved it to the firewall, yes, it will be under the body – but I need to get this thing built! Plus I think it looks pretty clean! I ran the hoses through the driver’s footbox and connected the clutch with 1/4″ line, and the two brake boosters were 3/8″ lines – I alternated the NPT fittings at the bottom of the reservoirs to avoid conflict and give enough room for the hoses to have clearance.



Since I was in the driver footbox, I figured it was time to mount the footbox floor and drill and cleco the remaining panels





Progress! Stay tuned for more!
Discover more from Cobra Dreams
Subscribe to get the latest posts sent to your email.